Development Control Committee - Basingstoke & Dean

Meeting Times
Scheduled Time
Start:
Wednesday, 10th June 2026
6:30 PM
End:
Wednesday, 10th June 2026
9:30 PM
Meeting Status
Status:
Confirmed
Date:
10 Jun 2026
Location:
Council Chamber - Deanes
Webcast:
Available
Meeting Attendees
Councillor Sheena Grassi photo
Committee Member
Councillor Sheena Grassi

Independent Member

Present, as expected

View Profile
Councillor Ronald Hussey photo
Committee Member
Councillor Ronald Hussey

Liberal Democrat

Present, as expected

View Profile
Councillor Karen Watts photo
Committee Member
Councillor Karen Watts

Basingstoke & Deane Independent Group

Present, as expected

View Profile
Councillor Andrea Bowes photo
Reserve
Chair of the Human Resources Committee
Councillor Andrea Bowes

Liberal Democrat

Not required

View Profile
Councillor Androulla Johnstone photo
Reserve
Councillor Androulla Johnstone

Liberal Democrat

Not required

View Profile
Councillor Simon Minas-Bound photo
Reserve
Leader of the Conservative Group
Councillor Simon Minas-Bound

Conservative

Not required

View Profile
Councillor Keith Oborn photo
Reserve
Councillor Keith Oborn

Basingstoke & Deane Independent Group

Not required

View Profile
Councillor Jo Perry photo
Reserve
Councillor Jo Perry

Conservative

Present, as substitute

View Profile
Councillor Kate Tuck photo
Reserve
Councillor Kate Tuck

Independent Member

Not required

View Profile
Officer
Assistant Planning Manager
Katherine Fitzherbert-Green

Expected

Councillor Andrew McCormick photo
Committee Member
Councillor Andrew McCormick

Labour and Co-Operative Party

Present, as expected

View Profile
Councillor Mike Bound photo
Committee Member
Councillor Mike Bound

Liberal Democrat

Present, as expected

View Profile
Councillor Richard Court photo
Committee Member
Councillor Richard Court

Conservative

Present, as expected

View Profile
Councillor Jay Ganesh photo
Committee Member
Councillor Jay Ganesh

Conservative

Apologies, sent representative

View Profile
Councillor Julian Jones photo
Committee Member
Vice Chair of the Resources Committee
Councillor Julian Jones

Basingstoke & Deane Independent Group

Present, as expected

View Profile
Councillor Tony Durrant photo
Chair
Chair of Development Control Committee
Councillor Tony Durrant

Basingstoke & Deane Independent Group

Present, as expected

View Profile
Councillor Angie Freeman photo
Committee Member
Chair of the Resident Services & Vice-Chair of Development Control Committee
Councillor Angie Freeman

Labour

Present, as expected

View Profile
Councillor Paul Miller photo
Committee Member
Leader of the Reform UK Group
Councillor Paul Miller

Reform UK

Present, as expected

View Profile
Councillor Marc Connor photo
Reserve
Councillor Marc Connor

Basingstoke & Deane Independent Group

Not required

View Profile
Councillor Colin Phillimore photo
Reserve
Chair of the Audit and Accounts Committee
Councillor Colin Phillimore

Basingstoke & Deane Independent Group

Not required

View Profile
Councillor Bikram Banerjee photo
Reserve
Councillor Bikram Banerjee

Labour and Co-Operative Party

Not required

View Profile
Councillor Ellen Hynes photo
Reserve
Councillor Ellen Hynes

Labour

Not required

View Profile
Councillor Christina Jordan photo
Reserve
Councillor Christina Jordan

Reform UK

Not required

View Profile
Agenda
1 Apologies for absence and substitutions
Minutes Councillor Ganesh was replaced by Councillor Perry.
2 Appointment of Vice-Chair
To appoint a Vice-Chair to the Development Control Committee for the 2026/27 municipal year.
Minutes Councillor Freeman was appointed Vice-Chair for the 2026/27 municipal year.
3 Declarations of interest
Minutes There were no declarations of interest.
4 Urgent matters
To consider any items of business, other than those shown on this agenda and which, by reason of special circumstances to be stated at the meeting, in the opinion of the Chairman, should be considered at the meeting as a matter of urgency
Minutes There were no urgent matters.
5 Minutes of the meeting held on the 20th May 2026
The Chair will move that the minutes of the meeting be signed as a correct record. The only part of the minutes that can be discussed is their accuracy.
Attachments:
Minutes The Chair confirmed that the minutes of the meeting held on the 20th May 2026 were confirmed by the Committee as a correct record.
6 Applications for planning permission and public participation thereon
This report details the planning applications to the Committee for consideration and decision.

Contact Officer: Planning and Development Manager

Wards Affected: Basing And Upton Grey, Evingar
Attachments:
Minutes The following Public Participation took place:

Interest

Name

Item no./Topic

Support

Mr Lewis

Item 4 - 26/00655/ROC

Item 1 - 25/01467/FUL: Demolition of existing building and redevelopment of the site to provide 326 apartments and ancillary communal facilities, with commercial floorspace (Use Class E), associated access, landscaping, and infrastructure. Site: 35 London Road Old Basing Basingstoke Hampshire

This application was withdrawn from the agenda prior to the meeting.

Item 2 - 26/00552/PIP: Application for Permission in Principle for residential development comprising a minimum of 4 and a maximum of 4 dwellings and associated access. Site: Land South Of Newland Lodge Woods Lane Cliddesden RG25 2JG

This application was withdrawn from the agenda prior to the meeting.

Item 3 - 26/00555/TDC: Application for Technical Details Consent in respect of the erection of 1 no. dwelling; in accordance with Permission in Principle Ref. 25/01234/PIP. Site: Plantation Cottage Westridge Highclere Hampshire

The Committee considered the report set out on pages of 129 of 160 of the agenda and other matters discussed at the meeting.

The Committee discussed the proposed application and noted that Permission in Principle had already been granted for the erection of one dwelling and therefore, the principle of development was established.

Members considered the application for Technical Details Consent and were of the view that it was a well-prepared scheme, with no sufficient planning grounds identified to warrant refusal.

Members noted that the existing access was located on a bend and, although not considered ideal, the officer’s report advised that the current arrangements were adequate to ensure safe entry to and exit from the site, with sufficient visibility of oncoming traffic and pedestrians. On that basis, the access was considered acceptable in highways terms.

RESOLVED that: the application be APPROVED subject to:

· the completion of a Section 106 legal agreement under the Town and Country Planning Act 1990 (as amended) to secure Biodiversity Net Gain land to the rear of the site

Should the requirements set out above not be satisfactorily secured, then the Head of Planning and Infrastructure be delegated to REFUSE permission for appropriate reasons.

On completion of the legal agreement the Head of Planning and Infrastructure be delegated to grant planning permission subject to the recommended conditions.

Conditions

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Location Plan - Drawing No. 201222-31

Proposed Site Plan - Drawing No. 201222-41 Revision A

Proposed Floor Plans and Elevations - Drawing No. 201222-40 Revision A

REASON: For the avoidance of doubt and in the interests of proper planning.

2 The development hereby permitted shall be begun before the expiration of 3 years from the date of this planning permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990 and to prevent an accumulation of unimplemented planning permissions.

3 No development above slab level shall take place until details/specification of the types and colours of external materials to be used, together with samples and details of any staining of painting of timber boarding have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out and thereafter maintained in accordance with the details so approved.

REASON: Details are required in the absence of accompanying the application and in the interests of the visual amenities of the area and in accordance with Policies EM1 and EM10 of the Basingstoke and Deane Local Plan 2011-2029.

4 No development shall take place on site above slab level until there has been submitted to and approved in writing by the Local Planning Authority a scheme of hard and soft landscaping which shall specify as a minimum:

species, planting sizes, spacing and numbers of trees/shrubs to be planted (including replacement trees where appropriate);

details of the hedgerows and any associated supporting fences to be installed to demarcate the curtilages of the properties;

hard surfacing to the front of the properties demonstrating that provision has been made to direct run-off water from any hard surface to a permeable or porous area or surface within the curtilage of the development;

maintenance programme detailing all operations to be carried out in order to allow successful establishment of planting.

The approved soft landscaping works approved shall be carried out in the first planting and seeding seasons following the first occupation of the building(s) or when the use hereby permitted is commenced. The approved hard landscaping works shall be implemented prior to first occupation of each dwelling. Any trees or plants which, within a period of 5 years from the date of planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.

REASON: Details are required prior to commencement above slab level because insufficient information has been submitted with the application in this regard, to improve the appearance of the site in the interests of visual amenity, acknowledging the location also within the National Landscape and in accordance with Policies EM1 and EM10 of the Basingstoke and Deane Local Plan 2011-2029.

5 No external lighting shall be installed within the site, unless otherwise agreed in writing by the Local Planning Authority on an application for such a development.

REASON: In the interests of the amenities of the area and the North Wessex Downs National Landscape and adjoining residential properties in accordance with Policies EM1, EM10 and EM12 of the Basingstoke and Deane Local Plan 2011-2029.

6 No work relating to the external construction of the development hereby approved, including works of preparation prior to operations, shall take place before the hours of 0730 nor after 1800 Monday to Friday, before the hours of 0800 nor after 1300 Saturdays nor on Sundays or recognised public holidays.

REASON: To protect the amenities of the occupiers of nearby properties during the construction period and in accordance with Policy EM12 of the Basingstoke and Deane Borough Local Plan 2011-2029.

7 No deliveries of construction materials or plant and machinery and no removal of any spoil from the site shall take place before the hours of 0730 nor after 1800 Monday to Friday, before the hours of 0800 nor after 1300 Saturdays nor on Sundays or recognised public holidays.

REASON: To protect the amenities of the occupiers of nearby properties during the construction period and in accordance Policy EM12 of the Basingstoke and Deane Local Plan 2011-2029.

8 The proposed development shall be undertaken in accordance with all proposed avoidance, mitigation and enhancement recommendations and procedures contained within Section 14 and 15 of the supporting Ecological Assessment Report (Phillips Ecology, October 2025) to address potential impacts on protected and notable species and habitats.

REASON: To meet with the Conservation of Habitats and Species Regulations 2017, the Wildlife and Countryside Act 1981 (as amended) in relation to protected and notable species, in accordance with Policy EM4 of the Basingstoke and Deane Local Plan 2011-2029.

9 Prior to commencement of development a Construction Environmental Management Plan (CEMP) or other similar strategy that sets out reasonable avoidance measures to be taken to avoid impacts on great crested newt and reptiles during the construction phase should be submitted to the local planning authority for approval. Following approval, the development will be undertaken in line with said plan.

REASON: To prevent impacts on great crested newt protected under the Conservation of Habitats and Species Regulations 2017 and to meet with Policy EM4 of the Basingstoke and Deane Local Plan 2011-2029 regarding prevention of adverse impacts on key species.

10 Protective measures, including fencing, ground protection, supervision, working procedures and special engineering solutions shall be carried out in accordance with the Arboricultural Impact Assessment and Method Statement (AIA & AMS) - (Full Report V2),dated 10 March 2026; Tree Protection Plan (TPP) - Plantation Cottage (March 2026), prepared by Naturally Trees, Tree protection fencing and ground protection shall be erected prior to any site activity starting and maintained throughout the development. The development shall be carried out in complete accordance with the approved Method Statement.

REASON: To ensure that the trees to be retained are in a safe and healthy condition to the benefit of the local amenities and the enhancement of the development itself, in accordance with Policies EM1 and EM10 of the Basingstoke and Deane Local Plan 2011-2029.

11 Prior to the first occupation of the dwelling, all areas indicated to be used for vehicles and pedestrians on the approved plan have been laid out with a drained surface. Provision shall be made to direct run-off water from the surface to a permeable or porous area or surface within the curtilage of the development. Such areas shall be retained as such for the lifetime of the development.

REASON: To ensure adequate provision for surface water drainage and in the interests of highway safety, in accordance with Policy CN9 of the Basingstoke and Deane Local Plan 2011-2029.

12 Prior to the first occupation of the dwelling provision shall be made within the curtilage for secure cycle storage for 3 long and 1 short stay places. The cycle storage shall thereafter be retained and maintained in perpetuity.

REASON: To improve provision for cyclists and discourage the use of the private car wherever possible and in accordance with Policies CN9 and EM10 of the Basingstoke and Deane Local Plan 2011- 2029.

13 Prior to the first occupation of the dwelling provision shall be made within the curtilage for refuse and recycling storage (prior to disposal), the surface materials from the carriageway to the waste container collection point shall be smooth and shall not hinder the movement of waste containers to the collection vehicle and shall make space to provide 1 number 240ltr refuse Wheelie bin, 1 number 240ltr recycling Wheelie bin, 1 number glass recycling box and 1 number food waste container for each dwelling, and the areas of land so provided shall not be used for any purposes other than the storage (prior to disposal) or the collection of refuse and recycling and shall be thereafter retained and maintained as such.

REASON: In the interests of general amenity, to ensure convenience of arrangements for refuse and recycling storage and collection and to ensure that no obstruction is caused on the adjoining highway, in the interest of highway safety and in accordance with Policies CN9 and EM10 of the Basingstoke and Deane Local Plan 2011- 2029.

14 No works pursuant to the commencement of this permission shall commence until there has been submitted to and approved in writing by the Local Planning Authority:-

(a) a desk top study carried out by a competent person documenting all the previous and existing land uses of the site and adjacent land in accordance with national guidance as set out in Contaminated Land Research Report Nos. 2 and 3 and BS10175:2011; and, unless otherwise agreed in writing by the Local Planning Authority,

(b) a site investigation report documenting the ground conditions of the site and incorporating chemical and gas analysis identified as being appropriate by the desk study in accordance with BS10175:2011- Investigation of Potentially Contaminated Sites - Code of Practice; and, unless otherwise agreed in writing by the Local Planning Authority,

(c) a detailed scheme for remedial works and measures to be undertaken to avoid risk from contaminants/or gases when the site is developed (including radon protection measures). The scheme must include a timetable of works and site management procedures and the nomination of a competent person to oversee the implementation of the works. The scheme must ensure that the site will not qualify as contaminated land under Part IIA of the Environmental Protection Act 1990 and if necessary proposals for future maintenance and monitoring.

Important note: Unless part (a) identifies significant contamination, it may transpire that part (a) is sufficient to satisfy this condition, meaning parts (b) and (c) need not be subsequently carried out. This would need to be agreed in writing by the Local Planning Authority.

If during any works contamination is encountered which has not been previously identified it should be reported immediately to the Local Planning Authority. The additional contamination shall be fully assessed and an appropriate remediation scheme, agreed in writing with the Local Planning Authority.

This must be conducted in accordance with DEFRA and the Environment Agency's 'Model Contamination Land Guidance at: https://www.gov.uk/contaminated-land, Last accessed October 2019.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors [in accordance with Policy EM12 of the Basingstoke and Deane Local Plan 2011-2029].

15 Prior to the first occupation of the dwelling a verification by the competent person approved under the provisions of condition 15(c) shall be submitted and approved by the Loal Planning Authority. Any remediation scheme required and approved under the provisions of condition 15(c) shall be implemented fully in accordance with the approved details (unless varied with the written agreement of the Local Planning Authority in advance of implementation). Unless otherwise agreed in writing by the Local Planning Authority such verification shall comprise;

as built drawings of the implemented scheme;

photographs of the remediation works in progress;

Certificates demonstrating that imported and/or material left in situ is free of contamination.

Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 15(c), unless otherwise agreed in writing by the Local Planning Authority.

REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy EM12 of the Basingstoke and Deane Local Plan 2011-2029.

16 No development above ground floor slab level shall take place until a Construction Statement detailing how the new homes shall meet a water efficiency standard of 110 litres or less per person per day has been submitted to and approved in writing by the Local Planning Authority, through a demonstration that this requirement for sustainable water use cannot be achieved on technical or viability grounds. The development shall be carried out in accordance with the approved details.

REASON: In the absence of such details being provided within the planning submission, details are required to ensure that the development delivers a level of sustainable water use in accordance with Policy EM9 of the Basingstoke and Deane Local Plan 2011-2029.

Biodiversity Net Gain

17 The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition "(the biodiversity gain condition") that development may NOT begin unless:

(a) a Biodiversity Gain Plan has been submitted to the planning authority, and

(b) the planning authority has approved the plan.

Therefore, prior to commencement, a Biodiversity Gain Plan (BGP) will need to be submitted and approved by the Local Planning Authority to enable the discharge the general biodiversity gain pre-commencement condition.

Your submission to deal with the above should provide full details of how the minimum 10% BNG requirement will be achieved. We recommend the use of DEFRA's Biodiversity Gain Plan template. The BGP should be accompanied by a fully completed metric, pre and post-development plans, a compensation plan where the development affects irreplaceable habitat, biodiversity net gain register references for any offsite biodiversity units (where applicable), proof of purchase for any statutory credits (where applicable) and a Habitat Management and Monitoring Plan (or similar document) that details how BNG will be managed and monitored over the 30 year period (we recommend use of Natural England's HMMP template).

Informative(s):-

1. 1.1 The applicant's attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated.

1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met.

1.3 The applicant's attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Details of the required fee can be found on our website - https://www.basingstoke.gov.uk/plan-app-process?chapter=81324#chapter81324 . Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.

2. In accordance with paragraph 39 of the National Planning Policy Framework (NPPF) in dealing with this application, the Council has worked with the applicant in the following positive and creative manner:-

seeking further information following receipt of the application;

considering the imposition of conditions a

In this instance:

the applicant was updated of any issues after the initial site visit;

the application was acceptable as submitted and no further assistance was required.

In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.

3. The Borough Council declared a Climate Emergency during 2019 formally making this declaration at the meeting of Cabinet in September 2019. This recognises the need to take urgent action to reduce both the emissions of the Council's own activities as a service provider but also those of the wider borough. In this respect, the Council is working with consultants at present to identify appropriate actions to achieve the targets that have been set. Beyond the requirements of any conditions that may be applicable to this planning permission and the current planning policy framework, the applicant is encouraged to explore all opportunities for implementing the development in a way that minimises impact on climate change. Where this in itself might require separate permission applicants can contact the council for advice through the following link: https://www.basingstoke.gov.uk/plan-app-process. For information more generally on the Climate Emergency please visit: https://www.basingstoke.gov.uk/climateemergency.

4. If this development will result in new postal addresses or changes in addresses, please contact the council's Street Naming and Numbering team on 01256 845539 or email GMSTeam@basingstoke.gov.uk to commence the process. Details can be found on the council's website.

5. The Council encourages all contractors to be 'Considerate Contractors' when working in the Borough by being aware of the needs of neighbours and the environment.

6. Works with potential to impact nesting birds should be conducted outside of the nesting bird season (considered March to September inclusive) or suitable habitat checked immediately prior to removal by an ecologist. If a nest is found it is to remain undisturbed until no longer active (absent of chicks or eggs). Under Section 1 of the Wildlife and Countryside Act 1981, it is an offence for any person who intentionally kills, injures, or takes any wild bird and/or takes, damages or destroys the nest of any wild bird while that nest is in use or being built.

7. In the UK, all bat species and their roosts are protected by law. Demolition and/or construction works should be carried out sensitively including soft stripping by hand of tiles and weatherboarding. Should signs of bats be located during works, then works should cease immediately and advice sought from a suitably qualified bat licensed ecologist to prevent any breach of legislation in relation to protection of bats and their roosts.

8. Great crested newt and their habitats are fully protected by law. Where great crested newt are discovered on site, all works should cease immediately and advice sought from a suitably qualified ecologist or Natural England. An enquiry can also be made to NatureSpace Partnership to explore use of the council's District Licence Scheme post-planning.

9. Please note that all CiL related information, including completed CiL forms, should be sent to the email address CILcharge@basingstoke.gov.uk

10. The development hereby approved is liable to the Community Infrastructure Levy (CIL). This means you may be required to make payments to the Council in accordance with the CIL Regulations. A Liability Notice setting out further details, including the amount of CIL payable, will be issued separately from this Decision Notice.

Some developments may be eligible for relief or exemption from CIL. Further information, including how to apply for relief or exemptions that may be available and how to claim them can be found at: https://www.gov.uk/guidance/community-infrastructure-levy#relief-and-exemptions. Relevant forms can be downloaded from the Planning Portal (at https://www.planningportal.co.uk/planning/policy-and-legislation/CIL/download-the-forms

If you have already submitted any additional CIL forms, these will be processed following the issue of the Liability Notice.

Prior to your development commencing you are required to submit

- CIL Form 2 (Assumption of Liability) (https://ecab.planningportal.co.uk/uploads/1app/forms/form_2_assumption_of_liability.pdf) and

- CIL Form 6 (Commencement Notice) (https://ecab.planningportal.co.uk/uploads/1app/forms/form_6_commencement_notice.pdf).

Failure to Assume Liability and submit a Commencement Notice prior to the commencement of development may result in the loss of any exemptions claimed; the loss of any right to pay by instalments; and additional costs to you in the form of surcharges (https://www.basingstoke.gov.uk/content/doclib/2569.pdf).

Please note that all CIL related enquiries and completed CIL forms, should be sent to CILcharge@basingstoke.gov.uk.

Item 4 - 26/00655/ROC: Variation of condition 1 of 25/01474/ROC for proposed dormers in place of the previously approved roof-lights and alterations to the internal layout. Site: Land At Park View House Church Lane Highclere Hampshire

The Committee considered the report set out on pages of 161 of 182 of the agenda and other matters discussed at the meeting.

The Committee discussed the proposed application and were supportive of the minor amendment to the original approval.

RESOLVED that: the application be APPROVED subject to the conditions and informatives listed below..

Conditions

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Site Plan/Landscape Plan - Drawing Number 24038/PL/02 Rev D

Floor Plans and Elevations Plan - Drawing Number 24038/PL/03 Rev E

Cart Shed - Drawing Number 220625-10

REASON: For the avoidance of doubt and in the interests of proper planning.

2 The materials to be used in the construction of the external surfaces of the development hereby permitted shall match, in type, colour and texture to those approved under 25/01712/CONDN.

REASON: In the interests of visual amenity and in accordance with Policy EM10 of the Basingstoke and Deane Local Plan 2011-2029

3 The approved screen walls/fences approved under 25/01712/CONDN shall be erected before the dwelling hereby approved is first occupied and shall subsequently be maintained.

REASON: In the interests of visual amenity and in accordance with Policies EM1 and EM10 of the Basingstoke and Deane Local Plan 2011-2029.

4 The development shall be undertaken in accordance with the planting details that have been submitted and approved under 25/01712/CONDN. The works approved shall be carried out in the first planting and seeding seasons following the first occupation of the building(s) or when the use hereby permitted is commenced. In addition, a maintenance programme detailing all operations to be carried out in order to allow successful establishment of planting, shall be submitted to and approved in writing by the Local Planning Authority before development commences. Any trees or plants which, within a period of 5 years from the date of planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, to be agreed in writing by the Local Planning Authority.

REASON: In the interests of visual amenity and in accordance with Policy EM10 of the Basingstoke and Deane Local Plan 2011-2029.

5 The materials to be used for the hard and paved surfacing have been submitted and approved under 25/01712/CONDN. The approved surfacing shall be completed before the adjoining buildings are first occupied and thereafter maintained.

REASON: In the interests of visual amenity and in accordance with Policy EM10 of the Basingstoke and Deane Local Plan 2011-2029.

6 Within 3 months of the date of this decision, a Construction Statement detailing how the new homes shall meet a water efficiency standard of 110 litres or less per person per day has been submitted to and approved in writing by the Local Planning Authority, through a demonstration that this requirement for sustainable water use cannot be achieved on technical or viability grounds. The development shall be carried out in accordance with the approved details.

REASON: In the absence of such details being provided within the planning submission, details are required to ensure that the development delivers a level of sustainable water use in accordance with Policy EM9 of the Basingstoke and Deane Local Plan 2011-2029.

7 The development shall be carried out in accordance with the Arboricultural Impact Assessment by Naturally Trees Ltd dated 02/11/2024 (received 04/11/2024), Tree Protection Plan Revision D received 04/11/2024, Arboricultural Impact Assessment Plan Revision C received 04/11/2024 and Services Plan received 22/10/2024, all submitted under 24/01959/TDC. Protective measures, including fencing, ground protection, working procedures and special engineering solutions shall be carried out in strict accordance with the approved details and be erected / installed prior to works commencing on site.

REASON: To ensure that reasonable measures are taken to safeguard trees in the interests of local amenity and the enhancement of the development itself, in accordance with the National Planning Policy Framework (December 2024) and Policy EM1 of the Basingstoke and Deane Local Plan 2011- 2029.

8 The development hereby permitted shall not be occupied, until provision for the turning, loading and unloading of vehicles and the parking of 3 vehicles has been made within the curtilage of the premises in accordance with Drawing No. 24038/PL/02 Rev. D. The areas of land / building so provided shall not be used for any purpose other than the turning, loading and unloading and parking of vehicles.

REASON: In the interests of highway safety and in accordance with Policies EM10 and CN9 of the Basingstoke and Deane Local Plan 2011-2029.

9 Cycle parking facilities shall be provided within the approved cart barn. Development shall be carried out, and thereafter maintained, in accordance with the approved details.

REASON: To improve provision for cyclists and discourage the use of the car wherever possible and in accordance with Policy CN9 of the Basingstoke and Deane Local Plan 2011-2029.

10 No work relating to the construction of the development hereby approved, including works of demolition or preparation prior to operations, or internal painting or fitting out, shall take place before the hours of 0730 nor after 1800 Monday to Friday, before the hours of 0800 nor after 1300 Saturdays nor on Sundays or recognised public holidays.

REASON: To protect the amenities of the occupiers of nearby properties during the construction period and in accordance Policy EM10 and EM12 of the Basingstoke and Deane Local Plan 2011-2029.

11 No deliveries of construction materials or plant and machinery and no removal of any spoil from the site shall take place before the hours of 0730 nor after 1800 Monday to Friday, before the hours of 0800 nor after 1300 Saturdays nor on Sundays or recognised public holidays.

REASON: To protect the amenities of the occupiers of nearby properties during the construction period and in accordance with Policy EM10 and EM12 of the Basingstoke and Deane Local Plan 2011-2029.

12 The works shall be undertaken in accordance with the radon gas risk assessment which has been submitted and approved under 25/01712/CONDN.

REASON: To ensure that adequate measures are taken to avoid the potential risk to future occupiers from natural gases arising from the ground and in accordance with Policy EM12 of the Basingstoke and Deane Local Plan 2011-2029.

13 The development hereby approved shall be undertaken in adherence with all proposed avoidance, mitigation and enhancement recommendations and procedures contained within Section 15 'Mitigation recommendations', Section 16 'Enhancements' Appendix 6 and Appendix 7 of the supporting Ecological Assessment (Phillips Ecology, Nov 23) to address potential impacts on protected and notable species submitted and approved under 24/01959/TDC.

REASON: To meet with the Conservation of Habitats and Species Regulations 2017, the Wildlife and Countryside Act 1981 (as amended) in relation to protected and notable species and in accordance with Policy EM4 of the Basingstoke and Deane Local Plan 2011-2029.

14 The works shall be undertaken in accordance with theA Construction Environmental Management Plan (CEMP) which has been submitted and approved under 25/01712/CONDN.

REASON: To meet requirements under the Wildlife and Countryside Act 1981 (as amended), the Natural Environment and Rural Communities Act 2006 and in accordance with Policy EM4 of the Basingstoke and Deane Local Plan 2011-2029.

15 The development shall be carried out and thereafter maintained in accordance with the Drainage Strategy (Rev A) by AAH Consultants received 23/08/2024. The approved details shall be implemented prior to the occupation of the dwelling hereby approved submitted and approved under 24/01959/TDC.

REASON: To provide adequate provision in regard to surface water and Foul Sewage and in accordance Policy EM7 of the Basingstoke and Deane Local Plan 2011-2029.

16 The electric vehicle charging provision (as shown on Drawing No's 220625-10 and 24038/PL/02 Rev D) shall be provided prior to occupation of the dwelling and shall thereafter be maintained in accordance with the approved details.

REASON: To ensure adequate provision in accordance with Policies CN9 and EM10 of the Basingstoke and Deane Local Plan 2011 to 2029 and the Parking Supplementary Planning Document (July 2018).

17 The works shall be undertaken in accordance with the Construction Transport Management Plan Details submitted and approved under 25/01712/CONDN. The provision shall be provided prior to the commencement of development, retained and used for the intended purpose for the duration of the construction period and that area shall not be used for any other purposes other than the parking and turning of vehicles and storage of construction materials respectively.

REASON: In the interests of highway safety and in accordance with Policy EM10 of the Basingstoke and Deane Local Plan 2011-2029.

Informative(s):-

1. 1.1 The applicant's attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated.

1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met.

1.3 The applicant's attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Details of the required fee can be found on our website - https://www.basingstoke.gov.uk/plan-app-process?chapter=81324#chapter81324 . Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.

2. In accordance with paragraph 39 of the National Planning Policy Framework (NPPF) in dealing with this application, the Council has worked with the applicant in the following positive and creative manner:-

considering the imposition of conditions

In this instance:

the application was acceptable as submitted and no further assistance was required.

In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.

3. The Borough Council declared a Climate Emergency during 2019 formally making this declaration at the meeting of Cabinet in September 2019. This recognises the need to take urgent action to reduce both the emissions of the Council's own activities as a service provider but also those of the wider borough. In this respect, the Council is working with consultants at present to identify appropriate actions to achieve the targets that have been set. Beyond the requirements of any conditions that may be applicable to this planning permission and the current planning policy framework, the applicant is encouraged to explore all opportunities for implementing the development in a way that minimises impact on climate change. Where this in itself might require separate permission applicants can contact the council for advice through the following link: https://www.basingstoke.gov.uk/plan-app-process. For information more generally on the Climate Emergency please visit: https://www.basingstoke.gov.uk/climateemergency.

4. In the event discoloured and/or odorous soils are encountered during foundations and other excavation works; or should any hazardous materials or significant quantities of made ground be found, then all development works shall be stopped and the Local Planning Authority contacted immediately. A scheme of works to investigate the risks and / or the adoption of any required remedial measures be submitted to, agreed and

approved in writing by the Local Planning Authority prior to the recommencement of development works.

5. This Decision Notice must be read in conjunction with a Planning Obligation completed under the terms of Section 106 of the Town and Country Planning Act 1990 (as amended). You are advised to satisfy yourself that you have all the relevant documentation.

6. The development hereby approved is liable to the Community Infrastructure Levy (CIL). This means you may be required to make payments to the Council in accordance with the CIL Regulations. A Liability Notice setting out further details, including the amount of CIL payable, will be issued separately from this Decision Notice.

Some developments may be eligible for relief or exemption from CIL. Further information, including how to apply for relief or exemptions that may be available and how to claim them can be found at: https://www.gov.uk/guidance/community-infrastructure-levy#relief-and-exemptions. Relevant forms can be downloaded from the Planning Portal (at https://www.planningportal.co.uk/planning/policy-and-legislation/CIL/download-the-forms

If you have already submitted any additional CIL forms, these will be processed following the issue of the Liability Notice.

Prior to your development commencing you are required to submit

CIL Form 2 (Assumption of Liability) (https://ecab.planningportal.co.uk/uploads/1app/forms/form_2_assumption_of_liability.pdf) and

CIL Form 6 (Commencement Notice) (https://ecab.planningportal.co.uk/uploads/1app/forms/form_6_commencement_notice.pdf).

Failure to Assume Liability and submit a Commencement Notice prior to the commencement of development may result in the loss of any exemptions claimed; the loss of any right to pay by instalments; and additional costs to you in the form of surcharges (https://www.basingstoke.gov.uk/content/doclib/2569.pdf).

Please note that all CIL related enquiries and completed CIL forms, should be sent to CILcharge@basingstoke.gov.uk.
7 Discharge of S106 agreement to remove restriction requiring The Barn and Yard and the Mill House to remain in the same ownership and occupation
The purpose of this report is for Members to consider the discharging of the obligations of a S106 Legal Agreement attached to the planning permission granted under reference BDB/33024.

Contact Officer: Planning and Development Manager
Minutes The Principal Planning Officer introduced the report which was for Members to consider the discharging of the obligations of a S106 Legal Agreement attached to the planning permission granted under reference BDB/33024 at The Barn at Burnside, the Mill House, Ecchinswell. Planning permission was granted on the 18th May 1992 for the “erection of 3 bed cottage and garage and refurbishment of existing barn”.

The planning permission was subject to a S106 Legal Agreement which restricted the separate use and ownership of a listed barn and required certain works to be completed prior to the occupation of the associated dwelling.

Since that time, a subsequent planning permission had been granted for the conversion of the barn into an independent dwelling, representing a material change in circumstances.

An application had subsequently been received to request the discharge of S106 agreement to remove restriction requiring The Barn and Yard and the Mill House to remain in the same ownership and occupation.

After considering the report Members agreed with the Officer summary within the report and recommendation.

RESOLVED that: the application be APPROVED subject to the entering into a deed of discharge so that the existing legal agreement can be discharged, as the obligations securing the barn, yard, and the Mill House to remain in the same ownership and occupation, and not to be disposed of separately are no longer considered to serve a useful or necessary planning purpose. In addition, the requirements relating to the completion and discharge of works approved under Listed Building Consent BDB 33025 have been satisfied and are no longer required to be retained within the legal agreement.
Previous Meetings
Meeting

7th Oct 2026 Webcast

Development Control Committee

Meeting

9th Sep 2026 Webcast

Development Control Committee

Meeting

12th Aug 2026 Webcast

Development Control Committee

Meeting

8th Jul 2026 Webcast

Development Control Committee

Meeting

10th Jun 2026 Webcast

Development Control Committee

Meeting

20th May 2026 Webcast

Development Control Committee

Meeting

8th Apr 2026 Webcast

Development Control Committee

Meeting

11th Mar 2026 Cancelled Webcast

Development Control Committee

Meeting

25th Feb 2026 Webcast

Development Control Committee

Meeting

11th Feb 2026 Webcast

Development Control Committee

Future Meetings
Meeting

11th Nov 2026 Webcast

Development Control Committee

Meeting

9th Dec 2026 Webcast

Development Control Committee

Meeting

6th Jan 2027 Webcast

Development Control Committee

Meeting

10th Feb 2027 Webcast

Development Control Committee

Meeting

10th Mar 2027 Webcast

Development Control Committee

Meeting

7th Apr 2027 Webcast

Development Control Committee

Join the Discussion

You need to be signed in to comment.

Sign in